Measurement on the Kraljeva gora water supply system

Flow measurement - water balance

Based on the Contract on performing the measurement service between "HKP Consulting" Banja Luka and "NMAqua" Banja Luka, in mid-October we started the implementation. For the purpose of recording the situation and repairing the water supply network of JKP "Kraljeva gora", the flow and pressure were measured on this system.

Kraljeva gora

Flow measurement was performed with ultrasonic flow meters at six measuring points. These measurements covered the entire water supply network with the current water balance.

Basic measurements were performed on the transport pipeline in the tunnel from the pumping station and pool Žeženica Tunel MM

Flow measurement was also performed at the Javornik reservoir, from which one pipeline is supplied to the center of the town of Han Pijesak and the other to Novo naselje.Rezervoar

In places that were in parts of the lower altitude zone, the measurement was performed for 24 hours. The aim was to make an assessment of the condition and calculation of losses on the water supply network based on the value of the night flow.

Nocni rad

Skola MM

Pressure measurement on the water supply system

Also in three places, which are determined as a priority, and due to the assessment of the situation and the assessment of losses, digital pressure meters have been programmed. The measurement was performed 24 hours. After the measurements were completed, a report was made with a brief analysis and observations.

Pritisakj