As part of the reconstruction of the sewerage network in Gradiška, for the needs of OCIDE CONSTRUCCTION VALENCIA, RJ BIJELJINA , the flow was measured at the pumping station Kej Gradiška,
Flow measurement was performed on a closed sewer system on Ø700mm and Ø300mm pipelines.
The measurement was performed in order to obtain confirmation of the technical characteristics of the installed sewage pumps with a capacity of 1000 l / s and 350 l / s in different conditions and operating modes.




Add a Comment