JKP Kraljeva Gora

Capacity check on the Kraljevo Gora system

MEASUREMENT OF AVAILABLE QUANTITIES OF WATER

Due to the need to measure the flow in order to assess the available quantities of water, as well as the condition of certain parts of the water supply system Public Utility Company "Kraljeva Gora" d.o.o. Han Pijesak contacted us again with a request for the mentioned works.

In mid-October, 24-hour flow measurements were performed at pre-determined temporary and control measuring points with ultrasonic portable flow meters AQF 2000.

Mjerač protoka AQF 2000

The flow meters are distributed from the Javornik reservoir along the entire network to the end consumers in the settlements of Džimrije, Mrkalji, Mironja and Ljeskovac, so that the condition of the water supply network could be better understood.

Mjerenje protoka

Based on the performed 24-hour measurements, as well as control current measurements, it is evident that there are evident losses on most parts of the pipeline network of the water supply network of JKP "Kraljeva Gora" Han Pijesak.

Mjerenje protoka u rezervoaru

They are especially pronounced in the lower lower parts, where the pressures are the highest and where the water supply network is the oldest, ie in the city center.

Sipovo mjerenje protoka

Analysis of the condition of the spring near Shipovo

Flow measurement at the source

At the spring near Shipovo, we performed control and flow measurement at catchments, despite very difficult hydrometeorological conditions. Due to the urgency and necessity of reviewing the situation on the mentioned network, we met the needs of our clients "KIV-ING" d.o.o. Banja Luka.

The flow measurement was performed on the water supply network which supplies the suburban settlement and the industrial forest complex. Although the conditions were very bad due to the snow, which covered the route of the pipeline as well as the catchment, the measurement was still performed. Due to poor conditions, the measurement was performed in a limited period of time.

Flow measurements were performed on the pipeline after catchment, as well as on the pipeline before the collection tank.

Condition analysis and remediation proposals

Based on the current flow measurement and the obtained results, as well as the needs of consumers, we performed a partial analysis of the network condition.

Proposals for rehabilitation works and bringing the spring into functional condition were also presented, in order to use the maximum capacity.

In the following period, after the stabilization of the weather, it is necessary to accurately locate the directions and connection point of the pipeline, as well as all-day flow measurements.

After measuring and analyzing the value of the night flow, the location of the losses on the pipeline will be located.