De measured the pressure on the entire water supply system at nine measuring points, including the lowest and highest elevations. In addition to the mentioned works, during the measurement, the manipulation of the sector closures was also carried out in order to balance the amount of water in certain parts of the system. Noise loggers were deployed at 18 locations, and after analyzing all the results, control and testing of certain parts of the water supply network was carried out, and faults were located.
Practical training was also carried out for working with the "Fuji" brand correlator in the field during the investigation of faults in parts of the water supply network. All the results were summarized, and after the analysis, a report was drawn up on the measurement and examination of losses in the distribution network of Lopar with a proposal to the investor to divide the implementation of the recovery of losses in the water supply system of Lopar into short-term, medium-term and long-term activities, which are also listed in the report.