Measurement and research of losses in the municipality of Kreševo
Based on the needs of measuring the flow and locating faults in the water supply system in Kreševo, the customer Hydro Control “d.o.o . Ilidža in the capacity of the Purchaser and NMAqua s.p Dejan Predojević in the capacity of the Contractor, performed field measurements and control of consumers and pipelines in the period from 11.03. to 13.03.2021. years.

According to the previously performed works on the water supply system JKP “Kostajnica” Kreševo and the Minutes from the field visit within the Project “Improvement of water supply in the municipality Kreševo” and the performed step test on the branch of the Meljine reservoir from by the client, it was necessary to perform micro-location of the area of losses on the specified part of the water supply network.
Flow measurement in subzones
It was also necessary to measure the flow and control the parts of the network where the illogical difference in the amount of flow at the measuring points is shown, for the part of the water supply network from the Meljine reservoir, which according to the previous step test suspected significant losses.





Measurement of quantities in the Meljine reservoir

Due to more expeditious work and research of illegal consumption and locations of uncontrolled consumption, ie losses, three flow meters were installed on the part of the main water supply network, which needed to be examined based on the results of the step test. Based on the results of measurements and analysis, parts of the water supply network were determined, on which it was necessary to perform detailed research.
By installing a flow meter in the Meljine reservoir, the amount of water entering the reservoir was measured, as well as the amount of water leaving the reservoir. Meters were placed before the water meter at the inlet and after the water meter at the outlet, where the most favorable conditions for measurement existed. After the measurement, a difference in the amount of water entering the tank between the water meter and the meter was observed.
After the first phase of flow measurement and research of losses and analysis of measurement results, and according to the Activity Plan, during May on the part of the water supply network supplied from the Meljine reservoir ultrasonic flow meters were installed at measuring points where there were even the smallest conditions for correct measurement.
The measuring points were determined in order to get the most complete insight into the distribution of the amount of water coming out of the Meljine reservoir on the part of the network where there are certain losses. During the measurement, three measuring points for all-day metering, seven places for control instantaneous metering and two metering points according to consumer business facilities were determined.



Simultaneously with the installation of the flow meter at the measuring points, the installation of the noise recorder was performed. The results of noise recording showed that the noise level does not indicate the existence of failures in the parts of the water supply network where they are installed.


After the completion of works on control, measurement and testing of pipelines and connections, it is estimated, based on the measured flow values, that about 4 l/s of uncontrolled water leakage on the water supply network was detected in the form of located faults.



According to the measurement data, considering the measured flow of the entrance to the Meljine reservoir of 8,145 l / s before detecting faults, night output of 6,606 l / s, the calculation gives a loss of about 80%, while reducing the night by 4 l / s faults on 2,606 l / s received a loss of about 32%.
Based on the conclusions on the conducted measurements and analysis of the results, Proposals for further activities to reduce losses and establish stability in the water supply system of the municipality of Kreševo were defined and presented. They need to be implemented as soon as possible in order to have a stable water supply of the population and economic capacities during the reduction of spring capacity, as well as increased consumption during the summer period.
Measurement of flow and pressure on MHPP "Sithonia"
Based on the accepted Offer, on the performance of the service of measuring flow and pressure between "ELNOS"Banja Luka in the capacity of the Purchaser and"NMAqua“Dejan Predojević s.p. Banja Luka, as the contractor, in December 2020, the measurement was performed.
The current pressure measurement was performed with two digital meters and flow measurement with one ultrasonic flow meter on the pipeline Ø700mm at the entrance to the mini hydro-power plant "Sithonia" in Gornji Podgradci.

Flow measurement on the inflow pipeline to the hydropower plant

Instantaneous flow measurement was performed ultrasonic flow meter on spirally welded steel pipeline of nominal profile Ø700 mm, where there were normal conditions that meet the technical requirements of precise measurement, ie on the rectilinear part of the pipeline.

Hydropower turbine pressure measurement
Pressure measurement was performed with two digital pressure gauge at an interval of 1 sec at two measuring points. The first pressure gauge is placed at the inlet to the plant, and the second is placed directly on the turbine.
Locating the fault on the hydrant network - the company Peštan d.o.o.
LOW-INTENSITY LEAKAGE
As long-term associates, we received an invitation from the management of the company "Peštan" to help them solve problems in the plumbing installation-hydrant network. 
The leak was very difficult to notice, because the intensity of water leakage is very low. At the same time, the pressures in this part of the city's water supply network oscillate a lot, which makes it difficult to locate the place of water loss.
As this is a water supply network within the company, which is known to us from previous research, the job of locating a fault on the hydrant network has been made easier, considering the time required.
The correlation method narrowed the circle to the part of the hydrant network around the last building-hall to the north.
As a small part of the network remained, a visual inspection of the terrain around the building, which is in the same range - earth and asphalt surface, was performed. There were no visible signs of loss on the ground, but an inspection of the manholes with plumbing fittings revealed a fault in the manhole at the Ø80 mm pipe connection fitting.
LOCATED LEAK
By measuring with an ultrasonic flow meter on the part of the network that remained for the loss investigation, and which was isolated, approximately the same amount of water was determined on the basis of the issued bill for the consumed water for a month.