Measurement on the Gorica system in Shipovo

Flow and pressure measurement

As part of the continuation of the conceptual solution of the problem of water supply from the spring on the water supply system of the forestry Gorica in Šipovo, flow measurement and pressure control were performed.

By measuring the flow of water on the two catchments from which the said water supply system is supplied, the available quantities were determined, ie their yield.

By visiting and visually inspecting the part of the indented pipeline 100 mm from the catchment to and behind the connection point, the problems that need to be eliminated in the next period in order for the system to be functional were also determined.

By recording the height elevations of the pipeline, for which there has been no documentation of this type so far, and by making a longitudinal profile, a plan of necessary repairs will be made. In addition to the rehabilitation of existing facilities, as well as the replacement of certain fittings and valves in line shafts and overflow chambers, it will be necessary to build some additional facilities, in order to put the network in the length of about 6 km into operation.

Pressure measurement with control was also performed on the air valve which has the function of reducing the pressure towards the chamber-tank Čardak.