JKP Kraljeva Gora

Capacity check on the Kraljevo Gora system

MEASUREMENT OF AVAILABLE QUANTITIES OF WATER

Due to the need to measure the flow in order to assess the available quantities of water, as well as the condition of certain parts of the water supply system Public Utility Company "Kraljeva Gora" d.o.o. Han Pijesak contacted us again with a request for the mentioned works.

In mid-October, 24-hour flow measurements were performed at pre-determined temporary and control measuring points with ultrasonic portable flow meters AQF 2000.

Mjerač protoka AQF 2000

The flow meters are distributed from the Javornik reservoir along the entire network to the end consumers in the settlements of Džimrije, Mrkalji, Mironja and Ljeskovac, so that the condition of the water supply network could be better understood.

Mjerenje protoka

Based on the performed 24-hour measurements, as well as control current measurements, it is evident that there are evident losses on most parts of the pipeline network of the water supply network of JKP "Kraljeva Gora" Han Pijesak.

Mjerenje protoka u rezervoaru

They are especially pronounced in the lower lower parts, where the pressures are the highest and where the water supply network is the oldest, ie in the city center.